Welcome to our first newsletter update for the work taking place at the Adult Hybrid Theatre 17.
So far on site:
– T.A.L.K Scaffolding have installed the temporary haki stairs and scaffollding for access to site level C and H heli pad.
– Yorkshire Hoist have installed the passenger and goods hoist for materials access to level C and H
– Hardwicks demolition is now complete
– Richardson Electrical and Floway Mechanical M&E strip out is now complete.
– Premier engineering have installed the plant deck with stairs on level H
– We have installed 70×70 box section steel posts for lead lined doors on level C