Cath Labs to date

Last year saw the completion of essential services at Leeds General Infirmary (LGI) at Cath Lab 1 in September.

Following this success, I&G have been approached to complete a further programme of remodelling and refurbishment works totalling four Cardiac Cath Lab suites at LGI. This will form part of a phased programme of works to upgrade mechanical and electrical (M&E) infrastructure that would serve the labs, to bring them up to the current HTM and BGN compliant standards with new Phillips medical equipment.

Following the completion of the previous three labs, I&G are currently on programme, awaiting the commissioning following the works for the fourth Cath Lab, ready for the specialist equipment installation by Phillips.

The improved labs will allow practitioners to use up-to-date methods of specialist treatment which will enhance patient care.

4587
screws used
112
meters of ducting installed
8
holes cored
90
%
waste diverted from landfill

Progress so far

The muchly anticipated Catheter Labs 6, is currently on track and is set to meet the targeted programme dates .

All works are on track and ready for the Phillips Installation, pending the mechanical commissioning and the final fit of the last door within the suite!

 

Over the next two weeks

Over the next four weeks Phillips will complete the works to install the specialist medical equipment. Once done, I&G will complete the final flourishes and decorations to completion.